Shantui Bulldozer Spare Parts SD22 Track Shoe Assy 8216-MD-381561

Machine Model: SHANTUI Bulldozer SD22 

Part Name:SD22 Track Shoe Assy 

Part Number: 8216-MD-381561


Contact Now E-Mail Telephone WhatsApp
Product Details

Product Overview

The track chain assembly, which is also called track link assy, is one part of undercarriage parts for crawler heavy equipments
such as excavator, bulldozer, crane, drilling machine etc.
The track chain assembly is made of idler shell, shaft, brackets, Bi-metallic Bearings and seal group. It is made by casting or
forging, machining, heat treatment, assembly, painting etc.
The quality and working life depends on the quality of raw steels, the hardness of rail surface, the depth of hardness layer, the
quality of seal group etc.

Track Shoe Assembly.jpg

Track Shoe Assembly.jpg

Specification
Material
35MnB
Finish
Smooth
Colors
Yellow
Technique
Forging / casting
Surface Hardness
HRC52-58,deepth:8mm-12mm
Warranty time
1 year
Certification
ISO9001
Delivery Time
Within 15 days after contract established

Packing & Delivery

Packing

1.Pallet or wooden carton. 

2.Big parts nude packing in container 

3.Packing as customer demands. 

Delivery

1.International Courier, Such as DHL, TNT,UPS

or Fedex.

2.By air/By sea

Products fully stocked, timely and efficient delivery.


Track Shoe Assembly.jpg

Company Profile

 Track Shoe Assembly.jpg

 

FAQ

Q1: Are you a trader or a manufacture?
A1: We are an industry and trade integration business,
Q2: How can I be sure the product is right for my machine?
A2: Please provide the part number of our product or the serial number of the machine. And we can customize for you according to drawings and sizes.
Q3: What kind terms of payment can be accepted?
A3: T/T, L/C, D/A, D/P is accepted, T/T30% as deposit, and 70% before delivery.
Q4: Which shipment you can supply?
A4: By sea, by air or by express(DHL, Fedex, TNT, UPS, EMS).
Q5: What is your delivery time please?
A5: If the goods are in stock, we can arrange delivery and transportation for you in 2-5 days. If it needs to be produced, it will take about 10-20 days.
Q6: How is the quality of the product?
A6: We have a perfect quality system to produce perfect products. And we can provide customers with products suitable for customers according to their requirements.

Leave your messages

Related Products

Popular products

x

Submitted successfully

We will contact you as soon as possible

Close